Bathroom Remodel

Bathroom remodel in Asheville — primary suite to powder room, aging-in-place capable

Primary bathroom and secondary bathroom remodels with custom tile work, vanity installation, frameless glass enclosures, and optional layout reconfiguration. Aging-in-place CAPS-certified design available.

Bathroom remodel in Asheville — primary suite to powder room, aging-in-place capable

Bathroom remodels are the most frequent residential renovation project — the NAHB Remodeling Market Index consistently identifies bathroom projects as the top completed remodel type by volume. In Western NC, two upgrades are most popular: heated floor (for mountain winter mornings) and curbless walk-in showers (aging-in-place + spa aesthetic).

Asheville-area bathroom pricing: powder room refresh $10,000-$18,000; secondary bathroom remodel $22,000-$38,000; primary bathroom standard remodel $32,000-$58,000; primary bathroom with structural changes (wall push-out, layout reconfiguration, heated floor, curbless shower) $58,000-$90,000.

For aging-in-place projects, our CAPS-certified designer (Anya Pham) specs every detail to look beautiful, not medical: curbless showers with linear drains, grab bars integrated into shower benches and towel rails, comfort-height toilets, lever-handle faucets, and lighting layered to support aging eyes. Most aging-in-place renovations look like premium spa bathrooms.

What's included

  • Design consultation + fixture / tile selection
  • Licensed plumbing + electrical rough-in and trim
  • Custom tile work (shower, floor, niche)
  • Vanity, fixtures, frameless glass enclosure
  • Heated floor option (Schluter DITRA-HEAT)
  • Aging-in-place CAPS-certified design available

Related services

Bathroom Remodel — common questions

How long does a bathroom remodel take?
3-9 weeks depending on scope. Powder room refresh: 2-3 weeks. Standard secondary bathroom (tile, vanity, fixtures, no layout change): 3-5 weeks. Primary bath standard: 5-7 weeks. Primary bath with layout reconfiguration + heated floor + curbless shower: 7-9 weeks.
Is heated floor worth it in the WNC mountains?
Yes — every WNC client who installs heated floor says it is the single best upgrade. Cost premium is $1,200-$2,800 depending on bathroom size; installs cleanly under tile during the rebuild; uses minimal electricity (only when needed). The comfort difference on a 22°F February morning at 2,300+ ft elevation is dramatic.
Can you do aging-in-place renovations that do not look like a hospital?
Yes — that is exactly what our CAPS-certified designer specializes in. Curbless showers with linear drains look more modern than traditional shower-glass enclosures. Grab bars are integrated as towel rails, shower benches, and railings — invisible-to-the-eye but supporting weight when needed. Most StoneRidge aging-in-place renovations look like premium spa bathrooms.
Can you handle the design or do I need an architect?
We handle both ends. Our designer walks the space, captures your preferences, and produces a finish board (tile, vanity, fixtures, paint) within 1-2 weeks. For structural changes (wall removal, push-out additions) we coordinate with our partner structural engineer for any required stamped drawings.

Get a site like this for your remodeling firm

VantaWeb builds and launches your remodeler site in 7 days. Anna captures project scope, qualifies budget and timeline, routes lead-safe (RRP) calls, flags historic-district projects, and books design consultations directly into your calendar — so your team can focus on the design and the build.

See how VantaWeb builds these — Book a 30 min call